Proven in the field, demonstrated through domestic and global supply records
MACTECH has validated its technology across a wide range of tunneling and underground projects, both in Korea and overseas, under diverse methods and site conditions.
Performance
Projects
-
Urban Railway & Rail Tunnels
Successfully applied in urban and regional rail tunnel projects, ensuring stability under complex ground conditions.
-
Road Tunnels
Performance proven across diverse construction environments, from long-distance tunnels to urban road tunnels.
-
Power, Communication & Utility Tunnels
Optimized for infrastructure tunnel conditions, ensuring ground stability and construction efficiency.
-
Water Supply, Sewer & Transport Tunnels
Applied in high-pressure environments where durability is critical, ensuring long-term stability.
-
Ground Engineering Works
Applied across various infrastructure projects for waterproofing, seepage control, and soft ground improvement, optimized for site-specific conditions.
Proven Compatibility
-
Method
· EPB · Slurry · Dual-density Slurry · Open-type Shield · Pipe Jacking
-
TBM
Compatibility has been verified with equipment from major global TBM manufacturers, including Herrenknecht, CREG, CRCHI, Robbins, and Kawasaki.
-
Project Scale
· Maximum tunnel diameter: up to 14.50 m · Maximum tunnel length: over 5 km · Over 20 subsea and river-crossing projects
Domestic & International Performance
Domestic Projects
International Projects
-
Since 1995
Over 25 years of experience, starting with early large-diameter shield projects in Korea including the Busan Metro Line 2 Suyeong River crossing section.
-
300+ Projects
Experience across over 300 projects, including more than 80 domestic shield projects and 50 international shield projects in metro, power utility, and sewer systems.
-
Collaboration with Contractors & Equipment Manufacturers
Extensive experience working with a wide range of domestic and international contractors and equipment manufacturers.
Shield TBM Project References
This list presents selected shield TBM project applications from our overall supply records.
Swipe left/right
| No. | Project Name | TBM Manufacturer | Type | Client |
|---|---|---|---|---|
| 1 | Busan Metro Line 2 River-Crossing Tunnel TBM (Suyeong River) | Kawasaki | Slurry | |
| 2 | Slurry | |||
| 3 | Slurry | |||
| 4 | Slurry | |||
| 5 | EPB | |||
| 6 | Slurry | |||
| 7 | Slurry | |||
| 8 | Slurry | |||
| 9 | Slurry | |||
| 10 | Slurry | |||
| 11 | Slurry | |||
| 12 | EPB | |||
| 13 | Slurry | |||
| 14 | Slurry | |||
| 15 | EPB | |||
| 16 | Slurry | |||
| 17 | EPB | |||
| 18 | EPB | |||
| 19 | EPB | |||
| 20 | EPB | |||
| 21 | EPB | |||
| 22 | EPB | |||
| 23 | EPB | |||
| 24 | EPB | |||
| 25 | EPB | |||
| 26 | Slurry | |||
| 27 | Slurry | |||
| 28 | Slurry | |||
| 29 | EPB | |||
| 30 | Slurry | |||
| 31 | EPB | |||
| 32 | EPB | |||
| 33 | Slurry | |||
| 34 | EPB | |||
| 35 | Slurry | |||
| 36 | Slurry | |||
| 37 | Slurry | |||
| 38 | Slurry | |||
| 39 | Slurry | |||
| 40 | Slurry | |||
| 41 | Slurry | |||
| 42 | Slurry | |||
| 43 | EPB | |||
| 44 | Slurry | |||
| 45 | Slurry | |||
| 46 | Slurry | |||
| 47 | Slurry | |||
| 48 | Slurry | |||
| 49 | EPB | |||
| 50 | EPB | |||
| 51 | Slurry | |||
| 52 | Slurry | |||
| 53 | Slurry | |||
| 54 | Slurry | |||
| 55 | Slurry | |||
| 56 | Slurry | |||
| 57 | Slurry | |||
| 58 | EPB | |||
| 59 | Slurry | |||
| 60 | Slurry | |||
| 61 | Slurry | |||
| 62 | Slurry | |||
| 63 | EPB | |||
| 64 | EPB | |||
| 65 | Slurry | |||
| 66 | Slurry | |||
| 67 | Slurry | |||
| 68 | Slurry | |||
| 69 | Slurry | |||
| 70 | Slurry | |||
| 71 | Slurry | |||
| 72 | Slurry | |||
| 73 | Slurry | |||
| 74 | Slurry | |||
| 75 | Slurry | |||
| 76 | Slurry | |||
| 77 | Slurry | |||
| 78 | Slurry | |||
| 79 | Slurry | |||
| 80 | Slurry |