Water Cut-off & Sealing / Ground Stabilization Grout
MAK GEL
MAK GEL is a two-component grout designed for water sealing, ground stabilization, and settlement control in underground construction, including shield tunneling. It fills ground voids and effectively controls groundwater inflow, particularly in unstable ground or high groundwater conditions. Unlike conventional suspension-type grouts, which have limited penetration due to solid particles, MAK GEL is a solution-type grout that penetrates deeply into soil pores without affecting construction equipment. It can be widely applied in tunneling, excavation, and water-related works, providing reliable ground stabilization and deformation control.
Product Features
-
1
Rapid Penetration and Ground Stabilization
As a particle-free liquid grout, it rapidly penetrates between soil particles, fills voids uniformly, and hardens to provide strong ground stabilization and water sealing.
-
2
Adjustable Gel Time
Gel time can be adjusted from 2 seconds to several minutes depending on the concentration of Solution A and B and the type of Solution B.
-
3
Multi-Purpose Application
A safe and highly workable grout material suitable for various ground improvement and sealing applications.
-
4
Reliable Performance Underwater
Maintains solidification even under water without washout or loss through ground voids.
-
5
No Adverse Effect on Equipment
Can be used during TBM operations without causing jamming or operational interference, and can replace conventional liquid lubricants that are vulnerable to groundwater conditions.
Packaging
A. MAK GEL- A : 18 L (25 kg) Can B. MAK GEL- B : 20 kg Bag
MAK GEL: Standard Mixing Ratio
- Based on preparation of 400 L
-
Liquid A (200 L)
-
MAK GEL-A
80 ~ 100L
-
Water
120 ~ 100L
Gel strength and gel time can be adjusted according to the amount of Liquid A.
-
-
Liquid B (200 L)
-
MAK GEL Series*
20kg
-
Water
190L
Gel time can be adjusted according to the amount of Liquid B.
-
| MAK GEL Series | Applications | Gel Time |
|---|---|---|
| B | Water cut-off / sealing Void filling Prevent ground collapse | 15sec ~ 20min |
| SB | 6 ~ 10Sec | |
| SS | 3 ~ 5Sec |
*Gel Time: Average range based on standard concentration and mixing ratio
CASE 1. Seoul Expressway Tunneling Project (Korea)
CASE 2. D-Wall Construction Project (Malaysia)
Application Results
· Overall view after groundwater was discharged following completion of ground water sealing around the vertical shaft through chemical grouting. · Confirmation that the shield equipment entrance gap was sealed and waterproofed with MAK GEL.