Products

Grouting / Backfilling

MAX Stabilizer

Stabilizer (Retarder) for Backfilling

MAX Stabilizer

In conventional LW backfilling, cement mortar often settles and hardens inside the A-solution pipeline, requiring immediate cleaning with water after operation to prevent pipe blockage. MAX Stabilizer is a backfill stabilizer that enhances the flowability of backfill materials while delaying the hardening time through excellent dispersion performance. This allows easier long-distance pumping and ensures that voids are filled uniformly and completely. When MAX Stabilizer is applied, pipeline blockage can be prevented even if the pipeline is not cleaned for up to three days.

Product Features

  • 1

    High Efficiency at Low Dosage

    Provides excellent improvement in flowability and effective delay of hardening time with a small amount of additive.

  • 2

    Suppression of Material Separation

    Effectively prevents material separation phenomena such as bleeding.

  • 3

    Safe and High-Purity Raw Materials

    Produced using high-purity materials also used as food additives, making it safe and non-hazardous to humans.

  • MAX Stabilizer

    Hardens within 2-3 hrs

  • MAX Stabilizer

    Maintains flowability for over 72 hrs

Packaging

18L Steel Can / 200L Plastic Drum / 1,000L IBC Tank

Show Products

Hide Products

plus